Seventh Ahvaz Bridge
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Balanced cantilever method
|
| Completed in: | 1999 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Ahvaz, Khuzestan, Iran, Asia |
|---|---|
| Crosses |
|
Technical Information
Dimensions
| span lengths | 30 m - 75 m - 2 x 140 m - 75 m - 30 m |
Materials
| deck |
prestressed concrete
|
|---|
Relevant Web Sites
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0033080 |
|---|---|
| Created: | 05/11/2007 |
| Last Updated: | 27/02/2013 |
