Baruia Transmission Mast
General Information
| Structural Type: |
Cable-stayed steel truss mast with triangular section
|
|---|---|
| Function / usage: |
VHF/UHF transmitter
|
| Completed in: | 2006 |
| Duration of works: | 21 days |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Baruia, Democratic Republic of the Congo, Africa |
|---|
Technical Information
Dimensions
| height | 63 m |
Participants
Design
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0023027 |
|---|---|
| Created: | 25/09/2006 |
| Last Updated: | 05/03/2013 |
