Grouft Tunnel
General Information
| Structural Type: |
Tunnel
|
|---|---|
| Function / usage: |
Road tunnel
|
| Built: | 2005 - 2009 |
| Duration of works: | 54 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Blaschette, Luxembourg, Europe |
|---|---|
| For |
|
| Part of: |
|
Technical Information
Dimensions
| length | 2 966 m | |
| tunnel section area | 117.0 m2 - 164.10 m2 | |
| number of tubes | 2 | |
| longitudinal slope | 4.5 % | |
| tube 1 | number of lanes | 2 |
| roadway / carriageway width | 7 m | |
| tube 2 | number of lanes | 3 |
| roadway / carriageway width | 10.5 m |
Quantities
| concrete volume | 85 000 m3 | |
| volume of extracted material | 680 000 m3 | |
| water proofing | 190 000 m2 | |
| shotcrete | 75 000 m3 |
Cost
| cost of construction | Euro 171 000 000 |
Participants
Owner
Client
Design
Co-contractor
Construction supervision
Health & personal safety coordination
Relevant Web Sites
-
Administration des Ponts et Chaussées: Tunnel Grouft
-
Association Momentanée Tunnel Grouft / Association Momntanée Tunnel Stafelter
Relevant Publications
- Le tunnel de toutes les précautions, in "Le Moniteur des Travaux Publics et du Bâtiment", 28 September 2007, n. 5418
Internal Information
| Structure-ID: | s0020409 |
|---|---|
| Created: | 12/04/2006 |
| Last Updated: | 05/03/2013 |



