Friede Viaduct
General Information
| Structural Type: |
Single-cell prestressed concrete box girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Balanced cantilever method
|
| Official designation: | 5614/61A |
| Built: | 2007 - 2009 |
| Duration of works: | 31 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Bleicherode, Nordhausen (Kreis), Thuringia, Germany, Europe Breitenworbis, Eichsfeld (Kreis), Thuringia, Germany, Europe |
|---|---|
| Carries |
|
| Part of: |
Technical Information
Dimensions
| total length | 485 m | |
| span lengths | 45.0 m - 65.0 m - 90.0 m - 165.0 m - 85.0 m - 35.0 m | |
| deck width | 29.50 m | |
| bridge surface | 14 308 m2 |
Quantities
| concrete volume | 21 290 m2 | |
| prestressing steel | 600 t | |
| reinforcing steel | 3 000 t |
Cost
| cost of construction | Euro 30 000 000 |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Participants
Owner
Client
General contractor
Design
Structural engineering
Geotechnical/geological experts
Checking engineering
Subcontractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- SUSPA-DSI Gewebeschläuche XXL bei Gründung einer Brücke eingesetzt, in "DSI Info", 2008- 2009, n. 16
- Großbrücken und ihre Herstellungsverfahren, in "Brückenbau", 2009- 2010, n. 4-1
- Brücken und Tunnel der Bundesfernstraßen 2010, Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany); pp. 45-56
Internal Information
| Structure-ID: | s0020188 |
|---|---|
| Created: | 21/03/2006 |
| Last Updated: | 27/02/2013 |
