• de
  • en
  • fr
  • International Database and Gallery of Structures

Weida Viaduct

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Balanced cantilever method
Other name(s): Weidatalbrücke
Built: 2004 - 2006
Duration of works: 33 months
Status: in use

Geographic Information & Related Structures

Location: Esperstedt, Obhausen, Saalekreis, Saxony-Anhalt, Germany, Europe
Carries
  • Autobahn A38
Part of:

Technical Information

Dimensions

length 453 m
span lengths 40 m - 54 m - 82 m - 11 m - 158 m - 11 m - 97 m
bridge surface 13 363 m2
height above valley floor or water 50 m
deck deck depth 3.5 - 9.0 m
deck width 2 x 14.50 m

Quantities

substructure concrete volume 7 235 m3
reinforcing steel 926 t
superstructure concrete volume 13 600 m3
reinforcing steel 2 040 t
internal prestressing 415 t
external prestressing 181 t

Cost

cost of construction Euro 17 000 000

Materials

deck prestressed concrete
piers reinforced concrete

Relevant Web Sites

Relevant Publications

Internal Information

Structure-ID: s0020180
Created: 21/03/2006
Last Updated: 27/02/2013