Weida Viaduct
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Balanced cantilever method
|
| Other name(s): | Weidatalbrücke |
| Built: | 2004 - 2006 |
| Duration of works: | 33 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Esperstedt, Obhausen, Saalekreis, Saxony-Anhalt, Germany, Europe |
|---|---|
| Carries |
|
| Part of: |
Technical Information
Dimensions
| length | 453 m | |
| span lengths | 40 m - 54 m - 82 m - 11 m - 158 m - 11 m - 97 m | |
| bridge surface | 13 363 m2 | |
| height above valley floor or water | 50 m | |
| deck | deck depth | 3.5 - 9.0 m |
| deck width | 2 x 14.50 m |
Quantities
| substructure | concrete volume | 7 235 m3 |
| reinforcing steel | 926 t | |
| superstructure | concrete volume | 13 600 m3 |
| reinforcing steel | 2 040 t | |
| internal prestressing | 415 t | |
| external prestressing | 181 t |
Cost
| cost of construction | Euro 17 000 000 |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Participants
Owner
Client
Preparation of tender documents
Original design
Structural engineering
Geotechnical/geological experts
Checking engineering
Contractor
Subcontractor
Construction supervision
Relevant Web Sites
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2008, Deutscher Bundes-Verlag, Cologne (Germany), ISBN 3935064543, 2008; pp. 115-124
Internal Information
| Structure-ID: | s0020180 |
|---|---|
| Created: | 21/03/2006 |
| Last Updated: | 27/02/2013 |
