• de
  • en
  • fr
  • International Database and Gallery of Structures

Rippachtal Junction Bridge No. 3/09

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Span-by-span in-situ casting on standard falsework
Official designation: BW 03/09
Built: 1996 - 1997
Duration of works: 20 months
Status: in use

Geographic Information & Related Structures

Location: Rippach, Lützen, Burgenlandkreis, Saxony-Anhalt, Germany, Europe
Crosses
  • Autobahn A9
Part of:

Technical Information

Dimensions

length 150.00 m
span lengths 32.0 m - 40.0 m - 44.0 m - 34.0 m
clearance 4.80 m
bridge surface 1 631 m2
deck deck depth 2.35 m
deck width 11.0 m

Quantities

concrete volume 2 529 m3
prestressing steel 36 t
reinforcing steel 268 t

Cost

cost of construction German Mark 3 700 000 (2 288 DM/m2)

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information

Structure-ID: s0020176
Created: 21/03/2006
Last Updated: 27/02/2013