Rippachtal Junction Bridge No. 3/08
General Information
| Structural Type: |
T-section girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Precast girders with cast-in-situ slab
|
| Official designation: | BW 03/08 |
| Built: | 1996 - 1997 |
| Duration of works: | 20 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Rippach, Lützen, Burgenlandkreis, Saxony-Anhalt, Germany, Europe |
|---|---|
| Carries |
|
| Crosses |
|
| Part of: |
Technical Information
Dimensions
| total length | 81.00 m | |
| span lengths | 18.0 m - 2 x 22.5 m - 18.0 m | |
| clearance | 4.80 m | |
| bridge surface | 4 131 m2 | |
| deck | deck depth | 1.10 m |
| deck width | 51.0 m |
Quantities
| concrete volume | 5 720 m3 | |
| reinforcing steel | 512 t |
Cost
| cost of construction | German Mark 6 500 000 (1 577 DM/m2) |
Materials
| deck slab |
reinforced concrete
|
|---|---|
| girders |
precast reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern, Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), ISBN 343301700X, 2004; pp. 122-127
Internal Information
| Structure-ID: | s0020175 |
|---|---|
| Created: | 21/03/2006 |
| Last Updated: | 27/02/2013 |
