Rippachtal Junction Bridge No. 3/07
General Information
| Structural Type: |
Girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Span-by-span in-situ casting on standard falsework
|
| Official designation: | BW 03/07 |
| Built: | 1996 - 1997 |
| Duration of works: | 20 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Rippach, Lützen, Burgenlandkreis, Saxony-Anhalt, Germany, Europe |
|---|---|
| Crosses |
|
| Part of: |
Technical Information
Dimensions
| total length | 173.00 m | |
| span lengths | 38.0 m - 47.0 m - 49.0 m - 39.0 m | |
| clearance | 4.95 m | |
| bridge surface | 1 903 m2 | |
| deck | deck depth | 2.35 m |
| deck width | 11.0 m |
Quantities
| concrete volume | 2 845 m3 | |
| prestressing steel | 59 t | |
| reinforcing steel | 315 t |
Cost
| cost of construction | German Mark 4 100 000 (2 129 DM/m2) |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Owner
Client
Original design
Structural engineering
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern, Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), ISBN 343301700X, 2004; pp. 122-127
Internal Information
| Structure-ID: | s0020174 |
|---|---|
| Created: | 21/03/2006 |
| Last Updated: | 27/02/2013 |
