• de
  • en
  • fr
  • International Database and Gallery of Structures

Leutenbach Tunnel

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method
Conventional tunnelling
Other name(s): Tunnel Leutenbach
Built: 2005 - 2009
Duration of works: 42 months
Status: in use

Geographic Information & Related Structures

Location: Winnenden, Rems-Murr-Kreis, Baden-Württemberg, Germany, Europe
Address: B 14
Coordinates: 48° 53' 1.00" N    9° 23' 43.00" E

Technical Information

Dimensions

tunnel length 1 080 m
length of cut-and-cover section 371 m + 50 m
roadway / carriageway width 7.50 m

Quantities

volume of extracted material 140 000 m3 + 133 000 m3
reinforced concrete volume 50 000 m3
shotcrete 15 500 m3

Cost

cost of construction ca. Euro 50 000 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information

Structure-ID: s0018020
Created: 10/10/2005
Last Updated: 27/02/2013