Prince Edward Viaduct
General Information
| Structural Type: |
Arch bridge
|
|---|---|
| Function / usage: |
Tramway, light or metro rail bridge
Road bridge |
| Other name(s): | Bloor Street Viaduct |
| Completed in: | 1918 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Toronto, Ontario, Canada, North America |
|---|---|
| Address: | Bloor Street |
| Crosses |
|
Technical Information
Dimensions
| length | 490 m | |
| height above valley floor or water | 40 m |
Chronology
| 1966 | The Bloor-Danforth Subway opens. It uses the lower deck of the bridge for which the designer had already provided in 1918. |
|---|---|
| 2003 | After more than 400 suicides, a barrier called the "Luminous Veil" is installed by architect Derek Revington. |
Participants
Relevant Web Sites
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0017862 |
|---|---|
| Created: | 29/09/2005 |
| Last Updated: | 27/02/2013 |
