Incheon Bridge
General Information
| Structural Type: |
Cable-stayed bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Built: | 2005 - 2009 |
| Status: | under construction |
Geographic Information & Related Structures
| Location: |
Incheon, South Korea, Asia |
|---|
Technical Information
Dimensions
| total length | 12.3 km | |
| main bridge | main span | 800 m |
| span lengths | 80 m - 260 m - 800 m - 260 m - 80 m | |
| pylons | height | 230.5 m |
Products, Services & Reports
ROBO®CONTROL Remote Monitoring System
Robo®Control detects the absence of machine specifications at the component and conveys these to a central computer. There the data are processed a ...
TENSA®MODULAR Type LR
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions ...
Participants
Structural engineering
Checking engineering
Main contractor
Co-contractor
Prestressing bars
Expansion joints
Specialist consultant
Relevant Web Sites
Relevant Publications
- Building on firm ground, in "Bridge Design & Engineering", 1st Quarter 2005, n. 38 v. 11
- Größtes Brückenbauprojekt Koreas mit DYWIDAG-Vorspannsystem gesichert, in "DSI Info", 2007- 2008, n. 15
- Giving an Incheon, in "Bridge Update", September 2005, n. 54
- DYWIDAG Post-Tensioning System incorporated into Korea's largest bridge construction project, in "DSI Info", 2007- 2008, n. 15
- Peak progress, in "Bridge Design & Engineering", 2nd Quarter 2008, n. 51 v. 14
- Business booster, in "Bridge Design & Engineering", 2nd Quarter 2006, n. 43 v. 12
- Size matters, in "Bridge Design & Engineering", 4th Quarter 2009, n. 57 v. 15
Internal Information
| Structure-ID: | s0015446 |
|---|---|
| Created: | 07/03/2005 |
| Last Updated: | 05/03/2013 |
