Pleissenbach Viaduct
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Other name(s): | Talbrücke Pleißenbach |
| Official designation: | BW 4 |
| Built: | 2005 - 2006 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Chemnitz, Saxony, Germany, Europe |
|---|---|
| Carries |
|
| Part of: |
Technical Information
Dimensions
| total length | 301 m | |
| span lengths | 33 - 49 m | |
| number of spans | 7 | |
| horizontal radius of curvature | 1 050 m | |
| height above valley floor or water | max. 18 m | |
| deck | deck width | 29.50 m |
| superelevation | 6 % |
Cost
| cost of construction | Euro 11 000 000 |
Materials
| girders |
steel
|
|---|
Participants
Owner
Client
Original design
Structural engineering
Contractor
Steel construction
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0014444 |
|---|---|
| Created: | 16/11/2004 |
| Last Updated: | 05/03/2013 |
