Bridge BR1G
General Information
| Structural Type: |
T-section girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Precast girders with cast-in-situ slab
|
| Completed in: | 2003 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Muscat, Oman, Asia |
|---|
Technical Information
Dimensions
| width | 13.5 m | |
| total length | 62 m |
Materials
| girders |
precast prestressed concrete
|
|---|
Products, Services & Reports
DYWIDAG Bonded Post-Tensioning Systems Using Strands
DYWIDAG Bonded Post-Tensioning Systems Using Strands have been used for decades: in bridge construction, the construction of reservoirs and for man ...
Participants
Structural engineering
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- 213 t of DYWIDAG Post-Tensioning System for bridges in Muscat, in "DSI Info", 2003- 2004, n. 12
- 213 t DYWIDAG-Spannsysteme für Brücken in Muskat, Oman, in "DSI Info", 2003- 2004, n. 12
- 213 tonnes de précontrainte DYWIDAG pour des ponts à Muscat, in "DSI Info", 2003- 2004, n. 12
Internal Information
| Structure-ID: | s0011731 |
|---|---|
| Created: | 07/04/2004 |
| Last Updated: | 27/02/2013 |
