Warnow Viaduct
General Information
| Structural Type: |
main bridge: T-section girder bridge approaches: T-section girder bridge |
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
main bridge: Balanced cantilever method approaches: Formwork carriage |
| Other name(s): | Talbrücke Warnow |
| Official designation: | BW 2818/8 |
| Built: | 1997 - 2000 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Papendorf (Warnow), Amt Warnow-West, Rostock (Kreis), Mecklenburg-Western Pomerania, Germany, Europe |
|---|---|
| Crosses |
|
| Part of: |
Technical Information
Dimensions
| total length | 930.1 m | |
| span lengths | 28.0 m - 2 x 24.6 m - 10 x 32.3 m - 37.3 m - 50.5 m - 74.0 m - 50.5 m - 9 x 32.3 m - 26.6 m | |
| clearance | 13 m | |
| bridge surface | 26 117 m2 | |
| deck | deck depth | 1.60 - 3.90 m |
| deck width | 11.82 m |
Cost
| cost of construction | German Mark 47 400 000 (1 810 DM/m2) |
Materials
| piers |
reinforced concrete
|
|---|---|
| deck of main bridge |
prestressed concrete
|
| deck of approaches |
prestressed concrete
|
| abutments |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Consulting
Checking engineering
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern, Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), ISBN 343301700X, 2004; pp. 13-18
Internal Information
| Structure-ID: | s0011516 |
|---|---|
| Created: | 28/02/2004 |
| Last Updated: | 05/03/2013 |
