Zipfel Viaduct
General Information
| Structural Type: |
Girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Formwork carriage
|
| Other name(s): | Zipfeltalbrücke |
| Built: | 2004 - 2006 |
| Status: | under construction |
Geographic Information & Related Structures
| Location: |
Winnenden, Rems-Murr-Kreis, Baden-Württemberg, Germany, Europe |
|---|---|
| Carries |
|
Technical Information
Dimensions
| total length | 465 m | |
| deck | deck depth | 1.25 - 2.2 m |
| piers | pier height | 8.5 - 21 m |
Quantities
| concrete volume | 15 000 m3 | |
| prestressing steel | 400 t | |
| reinforcing steel | 2 500 t |
Cost
| cost of construction | ca. Euro 11 600 000 |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Participants
Owner
Client
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0010848 |
|---|---|
| Created: | 03/12/2003 |
| Last Updated: | 27/02/2013 |
