Gyo-Dong Bridge
General Information
| Structural Type: |
T-section girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Formwork carriage
|
| Completed in: | 2005 |
| Status: | under construction |
Geographic Information & Related Structures
| Location: |
Gangjin County, Jeollanam-do, South Korea, Asia |
|---|
Technical Information
Dimensions
| total length | 400 m / 450 m | |
| span lengths | 8 x 50 m / 9 x 50 m | |
| horizontal radius of curvature | 2769.213 m / 2840.215 m | |
| deck | deck width | 2 x 12.6 m |
Quantities
| prestressing steel | 274 t |
Materials
| substructure |
reinforced concrete
|
|---|---|
| deck |
prestressed concrete
|
Participants
Owner
Design
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0010758 |
|---|---|
| Created: | 28/11/2003 |
| Last Updated: | 27/02/2013 |