Bul-Jeong Bridge
General Information
| Structural Type: |
Girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Incremental launching
|
| Completed in: | 2004 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Mungyeong, Gyeongsangbuk-do, South Korea, Asia |
|---|
Technical Information
Dimensions
| main span | 75 m | |
| total length | 705 m / 690 m | |
| horizontal radius of curvature | 0 m | |
| deck | deck width | 2 x 12.145 m |
Quantities
| prestressing steel | 692 t |
Materials
| substructure |
reinforced concrete
|
|---|---|
| deck |
prestressed concrete
|
Participants
Owner
Design
Co-contractor