Meyssiez Tunnel
General Information
| Structural Type: |
Tunnel
|
|---|---|
| Function / usage: |
High-speed rail tunnel
|
| Other name(s): | Tunnel de Meyssiez |
| Completed in: | 1993 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Meyssiès, Isère (38), Rhône-Alpes, France, Europe |
|---|---|
| Part of: |
|
Technical Information
Dimensions
| total length | 2 154 m | |
| tunnel length | 1 780 m | |
| embankment | 10 000 m3 |
Quantities
| concrete volume | 94 000 m3 | |
| reinforcing steel | 5 385 t | |
| excavated material | 300 000 m3 |
Cost
| cost of construction | French Franc 390 000 000 |
Participants
Owner
Client
Main contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Prolongement de la ligne à Grande Vitesse Paris Sud-Est de Lyon à Valence: Le tunnel de Meyssiez, presented at AFTES - Journées techniques, Toulon , 1993.
Internal Information
| Structure-ID: | s0010724 |
|---|---|
| Created: | 26/11/2003 |
| Last Updated: | 27/02/2013 |
