• de
  • en
  • fr
  • International Database and Gallery of Structures

Limehouse Link Tunnel

Limehouse Link Tunnel

General Information

Structural Type: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method
Completed in: 1993
Status: in use

Geographic Information & Related Structures

Location: Tower Hamlets, London, England, United Kingdom, Europe

Technical Information

Dimensions

tunnel length 1.8 km

Cost

cost of construction Pound sterling 293 300 000

Chronology

1986

Commissioning of feasibility study.

May 1993

Opening.

2000

Ownership is transferred to Transport for London, with maintenance provided by RMS Ltd.

Participants

Current owner

Initial construction

Owner

Relevant Web Sites

Relevant Publications

There is no relevant literature listed in the database.

Internal Information

Structure-ID: s0010488
Created: 17/10/2003
Last Updated: 05/03/2013