• de
  • en
  • fr
  • International Database and Gallery of Structures

Pleisse Viaduct

Pleisse Viaduct (Crimmitschau, 1997)

General Information

Structural Type: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Other name(s): Pleißetalbrücke
Official designation: BW 122
Built: 1995 - 1997
Duration of works: 27 months
Status: in use

Geographic Information & Related Structures

Location: Crimmitschau, Zwickau (Kreis), Saxony, Germany, Europe
Carries
  • Autobahn A4
Crosses
  • Pleisse River
Part of:

Technical Information

Dimensions

main span 45.50 m
width 36 m
total length 550 m
span lengths 35 m - 9 x 45.5 m - 2 x 37 m - 31 m
bridge surface 19 800 m2
height above valley floor or water 23 m
deck deck depth 3 m

Quantities

concrete volume 15 400 m3

Cost

cost of construction German Mark 38 000 000 (1 847 DM/m2)

Materials

deck prestressed concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

Internal Information

Structure-ID: s0009924
Created: 08/08/2003
Last Updated: 05/03/2013