Pleisse Viaduct
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Other name(s): | Pleißetalbrücke |
| Official designation: | BW 122 |
| Built: | 1995 - 1997 |
| Duration of works: | 27 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Crimmitschau, Zwickau (Kreis), Saxony, Germany, Europe |
|---|---|
| Carries |
|
| Crosses |
|
| Part of: |
Technical Information
Dimensions
| main span | 45.50 m | |
| width | 36 m | |
| total length | 550 m | |
| span lengths | 35 m - 9 x 45.5 m - 2 x 37 m - 31 m | |
| bridge surface | 19 800 m2 | |
| height above valley floor or water | 23 m | |
| deck | deck depth | 3 m |
Quantities
| concrete volume | 15 400 m3 |
Cost
| cost of construction | German Mark 38 000 000 (1 847 DM/m2) |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
Co-contractor
Pot bearings
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern, Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), ISBN 343301700X, 2004; pp. 65-70
Internal Information
| Structure-ID: | s0009924 |
|---|---|
| Created: | 08/08/2003 |
| Last Updated: | 05/03/2013 |
