Weihe Viaduct
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
Formwork carriage
|
| Other name(s): | Weihetalbrücke |
| Built: | 1992 - 1994 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Wildeck, Hersfeld-Rotenburg, Hesse, Germany, Europe Gerstungen, Wartburgkreis, Thuringia, Germany, Europe |
|---|---|
| Carries |
|
| Part of: |
Technical Information
Dimensions
| total length | 584 m | |
| span lengths | 52.00 m - 8 x 60.00 m - 52 m | |
| deck | deck depth | 4.00 m |
Cost
| cost of construction | German Mark 45 000 000 |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Participants
Owner
Client
Original design
Design
Structural engineering
Checking engineering
- Hensel Ingenieur GmbH (substructure)
- Bodo Hensel (checking engineer) (substructure)
- Frieder Thiele (checking engineer) (temporary works)
- Wolfgang Slomski (checking engineer) (superstructure)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken in Deutschland II, Deutscher Bundes-Verlag, Cologne (Germany), ISBN 3935064462, 2007; pp. 122-123
Internal Information
| Structure-ID: | s0009840 |
|---|---|
| Created: | 06/08/2003 |
| Last Updated: | 27/02/2013 |
