Float Viaduct
General Information
| Structural Type: |
Girder bridge
|
|---|---|
| Function / usage: |
Railroad (railway) bridge
|
| Completed in: | 1999 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Carstairs, South Lanarkshire, Scotland, United Kingdom, Europe |
|---|---|
| Crosses |
|
Technical Information
Dimensions
| total length | 80 m | |
| number of spans | 4 |
Cost
| cost of construction | Pound sterling 700 000 |
Materials
| deck |
steel
|
|---|
Chronology
| 2000 | Winner of the Structural Steel Design Award. |
|---|
Participants
Owner
Structural engineering
Main contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0009249 |
|---|---|
| Created: | 12/05/2003 |
| Last Updated: | 27/02/2013 |
