0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Thames River Bridge
Completion: 27 February 1943
Status: in use

Project Type

Awards and Distinctions

1943 Honorable Mention  

Location

Location: , , ,
Coordinates: 41° 21' 50" N    72° 5' 14.99" W
Show coordinates on a map

Technical Information

Dimensions

main span 164.62 m
total length 1 807.89 m
deck width 24.41 m

Cost

cost of construction United States dollar 3 775 000

Materials

piers reinforced concrete
truss steel

Participants

Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20008877
  • Published on:
    26/03/2003
  • Last updated on:
    31/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine