Viaduc de La Rivoire
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Built: | 1995 - 1996 |
| Duration of works: | 16 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Vif, Isère (38), Rhône-Alpes, France, Europe |
|---|---|
| Carries |
|
| Part of: |
Technical Information
Dimensions
| horizontal radius of curvature | 1000 m | |
| longitudinal slope | 4.8 % | |
| deck | width | 2 x 10.15 m |
| girder depth | 3.00 - 6.6 m | |
| roadway / carriageway width | 2 x 8.75 m | |
| width of box | 5.86 m | |
| Eastern bridge | total length | 247.00 m |
| span lengths | 64.00 m - 113.00 m - 70.00 m | |
| pier P2 | height | 34 m |
| pier P3 | height | 41 m |
| Western bridge | total length | 241.05 m |
| span lengths | 62.45 m - 110.70 m - 68.30 m |
Quantities
| deck | concrete volume | 4 000 m3 |
| prestressing steel | 210 t (53 kg/m3) | |
| reinforcing steel | 580 t (185 kg/m3) | |
| formwork | 18 500 m2 | |
| foundations P2 | concrete volume | 1 200 m3 |
| foundations P3 | concrete volume | 1 200 m3 |
| piers | concrete volume | 3 200 m3 |
| reinforcing steel | 413 t | |
| formwork | 9 200 m2 |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Chronology
| July 1995 | Construction begins. |
|---|
Participants
Owner
Client
Design
Construction engineers
Checking engineering
Main contractor
Co-contractor
Subcontractor
Prestressing
Concrete supplier
Sheet piling
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le viaduc de La Rivoire, in "Travaux", October 1999, n. 757
- Le viaduc de La Rivoire (Isère), in "Travaux", July - August 1997, n. 733