• de
  • en
  • fr
  • International Database and Gallery of Structures

Hopfenberg Tunnel

No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!

General Information

Structural Type: Tunnel
Function / usage: Road tunnel
Other name(s): Hopfenbergtunnel
Built: 2002 - 2005
Duration of works: 36 months
Status: in use

Geographic Information & Related Structures

Location: Walburg, Hessisch Lichtenau, Werra-Meißner-Kreis, Hesse, Germany, Europe
For
  • Autobahn A44
Part of:

Technical Information

Dimensions

tunnel section area 56.44 m2
northern tube tunnel length 544 m
southern tube tunnel length 6 539 m
vault thickness 35 - 60 cm

Quantities

concrete volume 13 578 m3
reinforcing steel 1 208 t
excavated material 166 846 m3
water proofing 23 250 m2

Materials

tunnel structure reinforced concrete

Relevant Web Sites

Relevant Publications

Internal Information

Structure-ID: s0007587
Created: 05/01/2003
Last Updated: 27/02/2013