Pyung-Yeo 2 Bridge
General Information
| Structural Type: |
Extradosed bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Other name(s): | Pyung-Yeo 2 Gyo |
| Construction began in: | 2002 |
| Status: | under construction |
Geographic Information & Related Structures
| Location: |
Yeosu, Jeollanam-do, South Korea, Asia |
|---|
Technical Information
Dimensions
| main span | 120 m | |
| width | 23.50 m | |
| total length | 250 m | |
| span lengths | 65 m - 120 m - 65 m |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Chronology
| 2000 - 2002 | Design phase. |
|---|
Notes
Pyung-Yeo 2 Gyo is the first Extradosed Bridge in Korea. The construction period is expected to be about 39 months and construction began September, 2002. It is a turn-key project for which SK Engineering & Construction won the first prize.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Slender solution, in "Bridge Design & Engineering", 2nd Quarter 2006, n. 43 v. 12
Internal Information
| Structure-ID: | s0007327 |
|---|---|
| Created: | 29/12/2002 |
| Last Updated: | 05/03/2013 |