Nahebrücke Münster-Sarmsheim
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Built: | 1956 - 1958 |
Geographic Information & Related Structures
| Location: |
Bingen am Rhein, Mainz-Bingen, Rhineland-Palatinate, Germany, Europe |
|---|---|
| Crosses |
|
Technical Information
Dimensions
| main span | 62.5 m | |
| total length | 368 m | |
| number of spans | 7 | |
| deck | deck depth | 2.75 m |
| deck width | 17.5 m |
Cost
| cost of construction | German Mark 3 774 000 |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Owner
Structural engineering
Checking engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Hochstraßen (2nd edition), Düsseldorf (Germany), 1967; pp. 68+
Internal Information
| Structure-ID: | s0006205 |
|---|---|
| Created: | 14/10/2002 |
| Last Updated: | 27/02/2013 |
