Wahnscheid Tunnel
General Information
| Structural Type: |
Tunnel
|
|---|---|
| Function / usage: |
High-speed rail tunnel
|
| Construction method: |
New Austrian Tunnelling Method (NATM)
|
| Other name(s): | Tunnel Wahnscheid |
| Built: | 1998 - 2001 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Montabaur, Westerwaldkreis, Rhineland-Palatinate, Germany, Europe |
|---|---|
| Part of: |
|
Technical Information
Dimensions
| tunnel length | 743 m |
Quantities
| concrete volume | 34 000 m3 | |
| reinforcing steel | 2 460 t | |
| volume of extracted material | 101 820 m3 |
Participants
Owner
Client
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0005787 |
|---|---|
| Created: | 02/10/2002 |
| Last Updated: | 27/02/2013 |
