Second Quiantang River Bridge
General Information
| Structural Type: |
Girder bridge
|
|---|---|
| Function / usage: |
Railroad (railway) bridge
Road bridge |
| Construction method: |
Balanced cantilever method
|
| Completed in: | 1991 |
Geographic Information & Related Structures
| Location: |
Hangzhou, Zhejiang, China, Asia |
|---|
Technical Information
Dimensions
| total length | 2 861.4 m / 1 792.8 m | |
| span lengths of main bridge | 45 m - 65 m - 14 x 80 m - 65 m - 45 m | |
| deck | deck width | 11.4 m / 20 m |
| main bridge | ||
|---|---|---|
| length | 2 x 1 340 m | |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Design
Structural engineering
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Engineering Handbook, CRC Press, Boca Raton (USA), ISBN 0849374340, 1999; pp. 63-15
Internal Information
| Structure-ID: | s0005666 |
|---|---|
| Created: | 30/09/2002 |
| Last Updated: | 27/02/2013 |
