Warnow Tunnel
General Information
| Structural Type: |
Immersed tube tunnel
Tunnel |
|---|---|
| Construction method: |
Immersed tube method
|
| Other name(s): | Warnowtunnel Rostock |
| Built: | 2000 - 2003 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Rostock, Mecklenburg-Western Pomerania, Germany, Europe |
|---|
Technical Information
Dimensions
| tunnel length | 790 m |
Quantities
| concrete volume | 80 000 m3 | |
| reinforcing steel | 7 000 t |
Cost
| cost of construction | Euro 225 000 000 |
Materials
| tunnel structure |
precast reinforced concrete
|
|---|
Chronology
| September 2033 | End of concession period. |
|---|
Participants
Owner
Client
Structural engineering
Geotechnical engineering
Construction
Contractor
Formwork
Construction supervision
Relevant Web Sites
Relevant Publications
- Rostock. Un tunnel immergé entre deux rives, in "Le Moniteur des Travaux Publics et du Bâtiment", 5 September 2003, n. 5206
- Confortement de l'assise du tunnel immergé de Rostock (RFA), in "Travaux", November 2003, n. 802
- Der Warnowtunnel - Absenktunnel und Konzessionsprojekt, HANSA International Maritime Journal, 03/2003, v. 140
- Fixed Crossing of the Warnow River, presented at AITES-ITA World Tunnel Congress — Progress in Tunnelling After 2000, Milan, 10-13/06/2001.
- The case for immersed tubes, in "Tunnels & Tunnelling International", May 2003
- Financement privé d'infrastructures routières, Tracés, n. 12, 22.06.2005
- La traversée sous-fluviale de la Warnow à Rostock en Allemagne, in "Travaux", February 2003, n. 794
Internal Information
| Structure-ID: | s0004903 |
|---|---|
| Created: | 08/09/2002 |
| Last Updated: | 19/03/2013 |
