Pianoro Tunnel
General Information
| Structural Type: |
Tunnel
|
|---|---|
| Function / usage: |
High-speed rail tunnel
|
| Construction method: |
ADECO-RS (Lunardi Method)
|
| Other name(s): | Galleria Pianoro |
| Built: | 1996 - 2009 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Bologna, Bologna, Emilia-Romagna, Italy, Europe |
|---|---|
| Part of: | |
| Coordinates: | 44° 27' 4.00" N 11° 22' 17.00" E |
Technical Information
Dimensions
| tunnel length | 10 711 m | |
| number of tracks | 2 | |
| tunnel section area | 150 m2 |
Quantities
| concrete volume | 485 000 m3 | |
| shotcrete | 280 000 m3 |
Chronology
| 15 June 2005 | Breakthrough at km 7.372 |
|---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Breakthrough per la galleria Pianoro, in "Strade e Autostrade", September 2005, n. 53
Internal Information
| Structure-ID: | s0004827 |
|---|---|
| Created: | 05/09/2002 |
| Last Updated: | 27/03/2013 |
