Mariansky Bridge
General Information
| Structural Type: |
Cable-stayed bridge without backstays
|
|---|---|
| Function / usage: |
Road bridge
|
| Other name(s): | Mariánský most |
| Built: | 1995 - 1998 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Ústí nad Labem, Ústí nad Labem Region, Czech Republic, Europe |
|---|---|
| Crosses |
|
Technical Information
Dimensions
| span lengths | 123.5 m - 55.5 m | |
| deck | deck depth | 3 m |
| deck width | 26.1 m | |
| pylon | pylon height | 60 m |
Materials
| pylon |
prestressed concrete
reinforced concrete |
|---|---|
| deck |
steel
|
Products, Services & Reports
DYNA Bond ® Anchorages
Because the DYNA Bond® anchorage can be filled either with cement or epoxy grout, it has excellent fatigue resistance and is protected a ...
Chronology
| December 1994 | Approved by the city. |
|---|---|
| December 1997 | Expected end of construction. |
Participants
Owner
Architecture
Structural engineering
Construction
Stay cables
Stay cable steel supplier
Relevant Web Sites
Relevant Publications
- Ten Years of Structural Engineering International, in "Structural Engineering International", February 2001, n. 1 v. 11
- Neue Schrägseilbrücke über die Elbe in Aussig, in "Stahlbau", January 1999, n. 1 v. 68
- The Marian Bridge, Czech Republic, in "Structural Engineering International", November 1998, n. 4 v. 8
- Bridge's mass appeal, in "Bridge Design & Engineering", November 1997, n. 9 v. 3
- Mariánský most v Ústí nad Labem / Mariánský Bridge in Ústí nad Labem, in "zlatý rez", n. 16
Internal Information
| Structure-ID: | s0004297 |
|---|---|
| Created: | 23/07/2002 |
| Last Updated: | 19/03/2013 |
