Carrières Viaduct
General Information
| Structural Type: |
main bridge: Box girder bridge approaches: T-section girder bridge |
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
main bridge: Balanced cantilever method |
| Built: | 1995 - 1996 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Nanterre, Hauts-de-Seine (92), Île-de-France, France, Europe Carrières-sur-Seine, Yvelines (78), Île-de-France, France, Europe |
|---|---|
| Crosses |
|
| Carries |
|
| Part of: | |
| Coordinates: | 48° 54' 24.00" N 2° 11' 35.00" E |
Technical Information
Dimensions
| approaches | total length | 155 m |
| span lengths | 5 x 30.5 m | |
| deck | deck width | 2 x 12.5 m |
| main bridge | deck depth | 3 - 8 m |
| total length | 510 m | |
| span lengths | 72 m - 3 x 122 m - 72 m |
Materials
| deck |
prestressed concrete
|
|---|
Participants
Co-contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- First Construction Phase of Paris Freeway Using VSL External Post-Tensioning Completed, in "VSL News", 1994, n. 2 v. 5
- Les viaducs, in "Travaux", October 1995, n. 713
Internal Information
| Structure-ID: | s0004119 |
|---|---|
| Created: | 03/07/2002 |
| Last Updated: | 05/03/2013 |
