Monorail Frame 68
General Information
| Structural Type: |
Rigid frame bridge
|
|---|---|
| Function / usage: |
Monorail bridge
|
| Construction method: |
Precast concrete elements with in-situ joints
|
| Completed in: | 2002 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Kuala Lumpur, Kuala Lumpur, Malaysia, Asia |
|---|---|
| Part of: |
Technical Information
Dimensions
| main span | 50 m | |
| span lengths | 25 m - 50 m - 25 m |
Materials
| superstructure |
precast prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Participants
- Nico Schmidt (structural engineer) (guideway beams)
- Manfred Braun (project manager) (guideway beams)
Alternative design
- Köhler + Seitz Beraten und Planen GmbH (superstructure)
Structural engineering
- Köhler + Seitz Beraten und Planen GmbH (superstructure)
- PJS International Sdn. Bhd. (substructure)
- Köhler + Seitz Beraten und Planen GmbH (guideway beams)
Contractor
- Genesis Structural Systems Sdn. Bhd (superstructure)
Bearings
Project management
- Köhler & Seitz Engineering Services (superstructure)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0004020 |
|---|---|
| Created: | 29/06/2002 |
| Last Updated: | 27/02/2013 |