Denkendorf Tunnel
General Information
| Structural Type: |
Tunnel
|
|---|---|
| Function / usage: |
High-speed rail tunnel
|
| Construction method: |
Cut-and-cover method
|
| Other name(s): | Tunnel Denkendorf |
| Built: | 2001 - 2006 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Denkendorf, Eichstätt (Kreis), Bavaria, Germany, Europe |
|---|---|
| Part of: |
Technical Information
Dimensions
| length | 1 950 m |
Materials
| tunnel structure |
reinforced concrete
|
|---|
Participants
Checking engineering
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | s0003958 |
|---|---|
| Created: | 24/06/2002 |
| Last Updated: | 27/02/2013 |
