• de
  • en
  • fr
  • International Database and Gallery of Structures

Miller Park

Miller Park Stadium

General Information

Structural Type: Truss
Function / usage: Stadium / Arena
Built: 1996 - 2001
Status: in use

Geographic Information & Related Structures

Location: Milwaukee, Milwaukee County, Wisconsin, USA, North America
Address: One Brewers Way
Coordinates: 43° 1' 41.00" N    87° 58' 17.00" W

Technical Information

Dimensions

span 183 m

Materials

roof truss steel

Chronology

September 1995

Design competition.

14 July 1999

Crawler crane erecting roof panels collapses in high winds killing three workers and causing $100 million in damages. Construction is delayed by a year.

6 April 2001

Stadium is ready for the opening game for the season. President George W. Bush throws the first pitch of the game.

Notes

The Miller Park Baseball Stadium's retractable roof developed malfunctions within the first year of acceptance by the owner, Southeast Wisconsin Professional Baseball District. Hardesty & Hanover teamed with LZA for evaluation and rehabilitation services. This $7 million project included evaluation, inspection and operational tests on the mechanical and electrical systems of the movable roof that lead to the development of operational monitoring systems and replacement of the roof pivot bearings. Automated systems were designed to monitor the position and movement of the roof and the drive motor power output during roof operations.
New pivot bearings and housings were designed to replace the faulty existing bearings. Bearing replacement required: jacking each of the five roof panels; removal of the existing bearings; in-place machining of each of the bearing's receiving surfaces; and installation of the new bearings. The replacement bearings each carry 2 million pounds.

Relevant Web Sites

Relevant Publications

  • Chan, Jacob & Gautrey, John Miller Park, in "The Arup Journal", 2002, n. 1 v. 37

Internal Information

Structure-ID: s0003467
Created: 03/06/2002
Last Updated: 05/03/2013