Murr Valley Viaduct
General Information
| Structural Type: |
Arch bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Built: | 2009 - 2011 |
| Duration of works: | 28 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Backnang, Rems-Murr-Kreis, Baden-Württemberg, Germany, Europe |
|---|---|
| Address: | Bundesstrasse 14 |
| Replaces |
Murr Valley Viaduct (1949)
|
| Coordinates: | 48° 56' 34.00" N 9° 24' 50.00" E |
Technical Information
Dimensions
| width | 14.25 m | |
| height | 25 m | |
| total length | 418.60 m | |
| main spans | 2 x 107.57 m | |
| span lengths | 3 x 24.00 m - 19.88 m - 2 x 107.57 m - 19.58 m - 3 x 24.00 m - 20.00 m | |
| bridge surface | 5 777 m2 | |
| arch | width | 2 m |
| depth | 1.40 m | |
| deck | girder depth | 1.20 m |
| piers | width | 1.6 m |
| depth | 1.0 m |
Quantities
| deck | concrete volume | 3 500 m3 |
| prestressing steel | 190 t | |
| reinforcing steel | 500 t | |
| substructure | concrete volume | 7 500 m3 |
| reinforcing steel | 900 t |
Cost
| cost of construction | Euro 15 000 000 |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete (C 35/45)
|
| arches |
reinforced concrete (C 50/60)
|
Participants
Owner
Client
Original design
Alternative design
Structural engineering
Geotechnical/geological experts
Checking engineering
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2012, Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2012; pp. 17-27
Internal Information
| Structure-ID: | s0003266 |
|---|---|
| Created: | 17/05/2002 |
| Last Updated: | 06/03/2013 |
