0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1311
Completion: 1335
Status: in use

Project Type

Structure: Pointed arch bridge
Function / usage: Road bridge
Material: Masonry bridge

Location

Location: , , ,
Crosses:
  • Tarn River
Coordinates: 44° 1' 1" N    1° 20' 59" E
Show coordinates on a map

Technical Information

Dimensions

main span 22.75 m
total length 205 m
span lengths 22.75 m - 21.56 m - 21.30 m - 21.39 m - 21.38 m - 21.43 m - 21.49 m
number of spans 7
deck deck width 7.85 m

Materials

arches masonry

Chronology

1303

Visit by King Philipp IV "le Bel" of France who orders the construction of the bridge the following year.

1335

The bridge is completed.

1663

One portal tower removed..

1701

Remaining portal tower removed.

1881

Widening.

Participants

Architecture

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002645
  • Published on:
    19/01/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine