No images are currently available for this data page. If you would like to help us illustrate this page, do not hesitate to send us your images!
General Information
|
Structural Type:
|
Tunnel
|
|
Function / usage:
|
Road tunnel
|
| Other name(s): |
Tunnel Hochwald |
| Official designation: |
5316/02 |
|
Built:
|
1998
- 2001
|
| Duration of works: |
41 months
|
| Status: |
in use
|
Geographic Information & Related Structures
Technical Information
Dimensions
|
total length |
2 x 1056 m |
| clear interior profile |
9.50 m x 4.50 m |
| tube |
roadway / carriageway width |
1 m + 2 x 3.75 m + 1 m = 9.50 |
Quantities
|
concrete volume |
21 160 m3 |
| concrete volume |
26 000 m3 |
| reinforcing steel |
1 435 t |
| volume of extracted material |
182 000 m3 |
| water proofing |
50 000 m3 |
| shotcrete |
49 800 m3 |
Cost
|
cost of construction |
German Mark 68 000 000
|
Materials
| tunnel structure |
reinforced concrete
|
Chronology
|
June 1998
|
Construction begins. |
|
November 2001
|
End of construction. |