Pierre-Pflimlin Bridge
General Information
| Structural Type: |
Box girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Balanced cantilever method
|
| Other name(s): | Altenheim-Eschau Bridge |
| Built: | 2000 - 2002 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Eschau, Bas-Rhin (67), Alsace, France, Europe Altenheim, Neuried, Ortenaukreis, Baden-Württemberg, Germany, Europe |
|---|---|
| Crosses |
|
Technical Information
Dimensions
| main span | 205 m | |
| total length | 957 m | |
| span lengths | 4 x 54 m - 121 m - 205 m - 139 m - 56 m - 3 x 64 m - 47 m | |
| deck | deck depth | 3.20 - 8.59 m |
| deck width | 14.75 m |
Quantities
| concrete volume | 18 000 m3 | |
| prestressing steel | 760 t | |
| reinforcing steel | 2 700 t |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Chronology
| 1959 | First talks between Germany and France about a new Rhine crossing near Strasbourg |
|---|---|
| 1973 | Entered into the Master Plan of the Strasbourg metro area. |
| 1977 | Principle accepted by the tripartite intergovernmental committee of France, Germany and Switzerland. |
| 1980 | Site between Altenheim and Eschau south of Strasbourg chosen by the tripartite committee. |
| 1983 | Entered into the Master Traffic Plan of the Land Baden-Württemberg. |
| 1984 | Study of 7 alignment alternatives by the DDE of the Département Bas-Rhin and the Regierungspräsidium Freiburg. Decision on the final alignment. |
| 1994 | Inscription of the financing into the contract "Strasburg, city of Europe", co-financed by the French Republic, the Region of Alsace and the Département of Bas-Rhin. |
| 1996 | Declaration of public utility on the French side. Signature of a Franco-German treaty. Detailed design of the project. |
| 1997 | Declaration of public utility on the German side. End of the design studies. |
| 1998 | Tendering. Preparatory works on the French side. |
| 1999 | Preparatory works on the German side. Contracts awarded on the main bridge and access viaducts on the French side. |
| 11 February 2000 | Ceremony for the placing of the first stone. |
Participants
Owner
Client
Original design
Architecture
Structural engineering
Co-contractor
Prestressing
Formwork
Relevant Web Sites
Relevant Publications
- Le pont Pierre-Pflimlin, in "Freyssinet Magazine", September - December 2001, n. 212
- Le pont sur le Rhin, in "Bulletin annuel de l'AFGC", January 2002, n. 4
- Two-faced finishes pose challenge for formwork, in "Bridge Design & Engineering", 1st Quarter 2002, n. 26 v. 8
- Deutsch-französischer Brückenschlag mit PERI VARIO im Freivorbau, in "PERI aktuell", 2002, n. 1
- Guide des dispositions constructives parasismiques des ouvrages en acier, béton, bois et maçonnerie, Presses de l'école nationale des Ponts et Chaussées, Paris (France), ISBN 2859784160, 2005
- A Strasbourg, le DDE communique, Service Public, n. 83, 09/2001
- Hochfester Beton im Brückenbau - Erfahrungen beim Bau der Spannbetonbrücke Altenheim-Eschau, in "Beton- und Stahlbetonbau", April 2003, n. 4 v. 98
- Le BHP, le béton dernier cri, in "Freyssinet Magazine", September - December 2002, n. 215
- Second pont sur le Rhin au sud de Strasbourg, in "Ouvrages d'art", June 2001, n. 38
- Le projet du second pont sur le Rhin au sud de Strasbourg, in "Travaux", January 2000, n. 760
- Second franchissement du Rhin au sud de Strasbourg, in "Travaux", February 2002, n. 783
- Second pont sur le Rhin au sud de Strasbourg, in "Ouvrages d'art", March 2001, n. 37
- Second pont sur le Rhin au sud de Strasbourg. La grande travée au-dessus du fleuve est achevée, in "Ouvrages d'art", March 2003, n. 42
- Synthèse des travaux du projet national BHP 2000 sur les bétons à hautes performances, Presses de l'Ecole des Ponts et Chaussées, Paris (France), ISBN 285978408X, 2005
- Second franchissement du Rhin au sud de Strasbourg. Le viaduc d'accès côté France est achevé, in "Travaux", October 2001, n. 779
- Le viaduc d'accès côté Allemagne, in "Ouvrages d'art", May 2002, n. 40
- Pont sur le Rhin entre Eschau et Altenheim, in "Ouvrages d'art", July 1999, n. 32
- Détection de fuites dans une digue par la méthode des mesures de températures, in "Ouvrages d'art", May 2000, n. 34
- Le second pont sur le Rhin au sud de Strasbourg: les travaux sont commencés, in "Travaux", May 2001, n. 775
- Le second franchissement du Rhin au sud de Strasbourg, in "Ouvrages d'art", May 2002, n. 40
- Strasbourg. Pont Pierre-Pflimlin: Un nouveau pont pour construire l'Europe, in "Construction moderne", 2003
Internal Information
| Structure-ID: | s0001819 |
|---|---|
| Created: | 24/08/2001 |
| Last Updated: | 05/03/2013 |