Kao-Ping Hsi Bridge
General Information
| Structural Type: |
Cable-stayed bridge
|
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Completed in: | 2000 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Pin-Tung, Taiwan, Asia Dapingding, Taiwan, Asia |
|---|---|
| Address: | Expressway No. 3 |
| Crosses |
|
Technical Information
Dimensions
| span lengths | 180 m - 330 m | |
| deck | deck depth | 3.20 m |
| deck width | 34.50 m | |
| pylon | pylon height | 183.5 m |
Materials
| pylon |
reinforced concrete
|
|---|---|
| deck of main span |
steel
|
| deck of side spans |
prestressed concrete
|
Notes
Public acces: Take the Kaohsiung bus from east side of Kaohsiung Railway Station to Cishan or Meinong on Route 21. Get off at Foguangshan Temple, walk 2 km to the north. The bus ride is approximately 1 hour and goes every 60 to 90 minutes.
Participants
Owner
Design
Wind tunnel testing
Aerodynamic testing
Structural engineering
Seismic engineering
Contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Kao-Pin Hsi Cable-Stayed Bridge, Taiwan, China, in "Structural Engineering International", May 1999, n. 2 v. 9
Internal Information
| Structure-ID: | s0001758 |
|---|---|
| Created: | 18/08/2001 |
| Last Updated: | 05/03/2013 |
