Franconia Bridge
General Information
| Structural Type: |
T-section girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Other name(s): | Frankenbrücke |
| Built: | 1991 - 1994 |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Coburg, Bavaria, Germany, Europe |
|---|
Technical Information
Dimensions
| length of ramp bridges | 185 m | |
| span lengths of main bridge | 37.48 m - 2 x 29.16 m - 33.79 m - 49.40 m | |
| span lengths of ramp bridges | 20.70 m - 20.50 m - 39.75 m / 42.26 m - 2 x 20.50 m - 20.70 m | |
| deck | deck width | 20 m / 6 m |
| main bridge | ||
|---|---|---|
| length | 179 m | |
Cost
| cost of construction | German Mark 26 350 000 (5728 DM/m2) |
Materials
| substructure |
reinforced concrete
|
|---|---|
| deck |
prestressed concrete
|
Notes
The ramp bridges are slab bridges.
Participants
- Alfred Krill (structural engineer) (superstructure)
Owner
Client
Structural engineering
- Bilfinger Berger SE (superstructure)
- Köhler + Seitz Beraten und Planen GmbH (substructure)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken der Bundesfernstraßen 1995, Verkehrsblatt-Verlag, Dortmund (Germany), ISBN 3892730725, 1995; pp. 61-70
Internal Information
| Structure-ID: | s0001151 |
|---|---|
| Created: | 08/12/2000 |
| Last Updated: | 05/03/2013 |
