Fischerdorf Bridge
General Information
| Structural Type: |
main bridge: Single (axial) tied-arch bridge approaches: Single-cell prestressed concrete box girder bridge |
|---|---|
| Function / usage: |
Motorway bridge / freeway bridge
|
| Construction method: |
approaches: Incremental launching |
| Other name(s): | Donaubrücke Fischerdorf |
| Built: | 1988 - 1991 |
| Duration of works: | 2 years 6 months |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Deggendorf, Deggendorf (Kreis), Bavaria, Germany, Europe |
|---|---|
| Crosses |
|
| Carries |
|
| Part of: | |
| Coordinates: | 48° 49' 42.00" N 12° 56' 55.00" E |
Technical Information
Dimensions
| total length | 661.5 m | |
| span lengths | 4 x 55.0 m - 55.3 m - 2.2 m - 102.5 m - 2.2 m - 55.3 m - 4 x 55.5 m | |
| bridge surface | 15 545 m2 | |
| deck | deck width | 23.5 m |
Quantities
| abutments | concrete volume | 980 m3 |
| reinforcing steel | 60 t | |
| arch | structural steel | 655 t |
| deck of approaches | concrete volume | 7 898 m3 |
| prestressing steel | 616 t | |
| reinforcing steel | 732 t | |
| foundations | concrete volume | 2 400 m3 |
| piers | concrete volume | 6 300 m3 |
| reinforcing steel | 320 t |
Cost
| concrete | cost of construction | German Mark 7 000 000 |
| overall structure | cost of construction | German Mark 34 000 000 |
| steel | cost of construction | German Mark 27 000 000 |
Materials
| piers |
reinforced concrete
|
|---|---|
| arch |
steel
|
| deck of main bridge |
reinforced concrete
|
| deck of approaches |
prestressed concrete
|
Participants
Owner
Client
Original design
Structural engineering
- Ingenieurbüro Meyer + Winter (steel)
- Köhler + Seitz Beraten und Planen GmbH (concrete)
Geotechnical/geological experts
Checking engineering
- D. Kraus (checking engineer) (concrete)
- Friedrich Nather (checking engineer) (steel)
Steel construction
Concrete construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Dauermessung an der Brücke Fischerdorf, presented at 3. Internationale Donaubrückenkonferenz, 3rd International Conference on Bridges across the Danube, 29-30/10/1998, Regensburg, Germany.
- Brücken der Bundesfernstraßen 1994, Verkehrsblatt-Verlag, Dortmund (Germany), ISBN 3892730709, 1994; pp. 123-135
- Die Vorlandbrücken der Donaubrücke Fischerdorf, in "Bautechnik", January 1993, n. 1 v. 70
- Gründung von Donaubrücken im bayerischen Raum, presented at 3. Internationale Donaubrückenkonferenz, 3rd International Conference on Bridges across the Danube, 29-30/10/1998, Regensburg, Germany.
- Un usual applications of the incremental launching method, presented at Bridges — Interaction between construction technology and design, IABSE Symposium, Leningrad, USSR 1991.
Internal Information
| Structure-ID: | s0001141 |
|---|---|
| Created: | 25/11/2000 |
| Last Updated: | 19/03/2013 |
