Lech Viaduct
General Information
| Structural Type: |
Single-cell prestressed concrete box girder bridge
|
|---|---|
| Function / usage: |
Road bridge
|
| Construction method: |
Balanced cantilever method
|
| Other name(s): | Lechtalbrücke Schongau |
| Built: | 1988 - 1991 |
| Duration of works: | 3 years |
| Status: | in use |
Geographic Information & Related Structures
| Location: |
Schongau, Weilheim-Schongau, Bavaria, Germany, Europe |
|---|---|
| Carries |
|
Technical Information
Dimensions
| total length | 566.0 m | |
| span lengths | 76.9 m - 4 x 104.15 m - 72.5 m | |
| bridge surface | 8 405 m2 | |
| deck | deck depth | 3.00 - 6.00 m |
| deck width | 14.85 m |
Quantities
| concrete volume | 12 000 m3 | |
| prestressing steel | 500 t | |
| reinforcing steel | 1 100 t |
Design Loads
| live load | Brückenklasse 60/30 (DIN 1072) |
Cost
| cost of construction | ca. German Mark 21 000 000 | |
| cost of construction per m2 | 2 499 |
Materials
| deck |
prestressed concrete
|
|---|---|
| piers |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken der Bundesfernstraßen 1994, Verkehrsblatt-Verlag, Dortmund (Germany), ISBN 3892730709, 1994; pp. 75-85
- Brücken in Deutschland für Straßen und Wege, Deutscher Bundesverlag, Cologne (Germany), ISBN 3935064411, 2006; pp. 112-113
Internal Information
| Structure-ID: | s0001135 |
|---|---|
| Created: | 25/11/2000 |
| Last Updated: | 27/02/2013 |
