Vigezzina Railway
General Information
| Function / usage: |
Railroad (railway) line
|
|---|---|
| Other name(s): | Centovalli Railway |
| Built: | 1912 - 1923 |
| Status: | in use |
Geographic Information & Related Structures
| km | Name |
Technical Information
Dimensions
| total length | 52.183 km | |
| number of bridges | 83 | |
| number of tunnels | 31 | |
| longitudinal slope | max. 6% |
Chronology
| 1909 - 1910 | Project approval. |
|---|---|
| 1912 | Start of works on the Italian side. |
| 1913 | Start of works on the Swiss side. |
| 1914 - 1916 | Various interruptions in construction due to World War I. |
| 1921 | Construction resumes. |
| 27 March 1923 | The line is joined from the Swiss and Italian sides at Santa Maria Maggiore. |
| 25 November 1923 | Inauguration of the line. |
Notes
Of the line 32.283 km are located in Italy and the remaining 19.900 km are in Switzerland. It is a narrow-gauge line with 1.000 m width.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
There is no relevant literature listed in the database.
Internal Information
| Structure-ID: | p0056180 |
|---|---|
| Created: | 03/04/2010 |
| Last Updated: | 27/02/2013 |
