0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): South Shore Bridge
Beginning of works: 26 May 1925
Completion: 14 May 1930
Status: in use

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Saint Lawrence
Coordinates: 45° 31' 18.27" N    73° 32' 31.53" W
Coordinates: 45° 31' 16.76" N    73° 31' 32.71" W
Show coordinates on a map

Technical Information

Dimensions

main span 334.35 m
total length 2 687.42 m
length of drop-in span 115.35 m
span lengths of main bridge 128.00 m - 334.35 m - 128.00 m
northern approach viaduct total length 594.36 m
southern approach viaduct length 1502.66 m
main bridge
length 590.35 m

Materials

truss steel

Chronology

14 May 1930

Opening to traffic

1 September 1934

Official name change to "Pont Jacques-Cartier / Jacques Cartier Bridge"

1959

Tramway tracks are removed.

Notes

The bridge has also been called: Pont de la rive-Sud, South Shore Bridge, Pont du Havre, Harbour Bridge.

Excerpt from Wikipedia

The Jacques Cartier Bridge (French:pont Jacques-Cartier) is a steel truss cantilever bridge crossing the Saint Lawrence River from Montreal Island, Montreal, Quebec to the south shore at Longueuil, Quebec, Canada. The bridge crosses Île Sainte-Hélène in the centre of the river, where offramps allow access to the Parc Jean-Drapeau and La Ronde amusement park.

Originally named the Montreal Harbour Bridge (pont du Havre), it was renamed in 1934 to commemorate the 400th anniversary of Jacques Cartier's first voyage up the St. Lawrence River.

The five-lane highway bridge is 3,425.6 m (11,239 ft) in length, including the approach viaducts. There are approximately 35.8 million vehicle crossings annually, making it the third busiest bridge in Canada, the first being Samuel-de-Champlain Bridge, just a few kilometres upstream. The second busiest bridge in Canada overall is the Port Mann Bridge in Metro Vancouver (connecting Surrey to Coquitlam).

Together with the Champlain Bridge, it is administered by the Jacques Cartier and Champlain Bridges Incorporated (JCCBI), a Canadian Crown Corporation which reports to Infrastructure Canada.

History

Planning

Discussions began as early as 1874 about the construction of a new bridge to alleviate the congestion on Victoria Bridge, which was then a rail-only bridge, the wintertime ice bridge and the ferries used to connect the city to its south shore. The decision to build the bridge was made official in 1924. The bridge was designed by engineer Philip Louis Pratley.

Construction

Construction was undertaken by the Dominion Bridge Company starting in 1925. On August 9, 1926 the cornerstone was laid, integrated into the pillar at the corner of Notre Dame Street and Saint Antoine Street, opposite the Pied-du-Courant Prison. The cornerstone contains a capsule with 59 items reflecting the year in which construction began. The bridge was constructed of steel at a cost of C$23 million, and the work lasted two and a half years.

The groundbreaking was held on May 26, 1925. Construction began immediately and the cornerstone was laid on August 9, 1926 on Pillar No. 26. The superstructure was built between September 1926 and September 1929. 33,267 tons of steel were needed for its construction. The work was completed about a year and a half ahead of schedule, without disrupting river traffic.

It opened to traffic on May 14, 1930, however the inauguration ceremony took place a few days later, on May 24. The bridge was inaugurated as the "Harbour Bridge" but was renamed "Jacques Cartier Bridge" in 1934, following a petition from citizens to honor the explorer who discovered Canada in 1534.

Modifications

The bridge was originally designed as a road, tramway, and pedestrian bridge. The original bridge had three lanes of road traffic and two sidewalks. Space in each direction was left free for the possible installation of two tramway lines. Tramway tracks were installed but never used. A parallel empty space used to exist to the right of the roadway in each direction, through which the bridge's girders could be seen.

The roadway was expanded by an additional traffic lane on the east side in 1956 and the west side in 1959 to include the space allocated to the tramway tracks, adding an extra lane of traffic in each direction and bringing the total capacity of the bridge to five lanes. The two sidewalks were outside the bridge proper.

To accommodate large ships using the new St. Lawrence Seaway, the span over the east channel of the river (the Warren truss) was raised an additional 80 feet (24.4 m) (to 120 feet or 36.6 metres) in 1957 and 1958. Traffic flow over the bridge was uninterrupted by this construction, through the installation of two Bailey bridges.

Originally, the bridge was constructed with only one ramp to Saint Helen's Island, located on the western side of the bridge. In 1961, a second ramp was built on the east side to prevent cars traveling to Montreal from having to cross the path of those heading toward Longueuil, a major source of accidents.

During 2001 and 2002 the entire deck of the bridge was replaced. The sidewalks were also widened to a width of 8-foot (2.44 m), and the sidewalk on the western side of the bridge was made a bike path.

In 2004, a suicide prevention barrier was installed. Until then the bridge saw an average of 10 suicides a year.

There are four 3-metre high finials, at the four high-points of the bridge, as architectural ornaments. Their shape resembles the Eiffel Tower without being a replica.

Inspiration

The back of the Jacques Cartier Bridge is located at the exit leading to Île Sainte-Hélène and was donated by France. The bridge follows the general design concept of the Quebec Bridge. It was, in turn, one of the design influences for the Story Bridge, in Brisbane, Australia, which was completed in 1940. Its imposing steel structure of its main section most likely inspired the designers of J. C. Van Horne Bridge spanning the Restigouche River between Campbellton, New Brunswick and Pointe-à-la-Croix, Quebec. This bridge was not built until 1958.

Toll

The structure was a toll bridge from its opening until 1962 and a toll plaza was located on the southern approach. The toll plaza area now houses the offices of the corporation that owns and operates the structure and the nearby Champlain Bridge. Tokens were issued for part of the period that tolls were collected. Toll booths were abolished in 1962.

The original toll rates were as follows:

  • Pedestrian: 15¢
  • Cyclist: 15¢
  • Motorcyclist: 25¢
  • Automobile (for the vehicle and its driver): 25¢
  • Additional passenger: 15¢
  • Bus: 80¢ to $1.00 (depending on class of bus)
  • Truck: 25¢ to $1.50 (depending on the class of the truck)
  • Oil tank: 60¢
  • Animals: 3¢ to 15¢ per animal (depending on the species)
  • Wheelbarrow: 15¢
  • Free for children under 5 years old.

"The crooked bridge"

From the beginning of its use, the Jacques Cartier Bridge was nicknamed "the crooked bridge" because of a curve at the entrance to Montreal. It was designed to avoid the land of a soap factory owner who refused the amount the city offered him for his land.

Another curve in the middle of the bridge at the height of Île Sainte-Hélène is due to the positioning of the pillars. The pillars were built according to the direction of the stream of the river in a different axis of the streets to the North approach on the island of Montreal.

The existence of these curves has been a predominant factor in many accidents that have led to changes in signage on the bridge over the years.

Traffic

The bridge has five traffic lanes, two of which are directional and one reversible for rush hour traffic and two sidewalks on each side for pedestrians and cyclists. It is also known for its famous Craig curve, a curve on the side of Montreal that once created many accidents because of its small radius and zero tilt. This deficiency was corrected in the early 2000s by raising the west side of the deck creating a slight tilt making it easier to take the curve.

The bridge is the continuation of Highway 134 and is connected to the multiplex formed by Highway 20 and the René-Lévesque Highway via an interchange. It continues on the South Shore in a short motorway section of the 134 km long road, which ends at an interchange with roads 112 and 116, before becoming boulevard Taschereau.

On the Island of Montreal, the bridge connects to De Lorimier Avenue East and Papineau Avenue West.

It is estimated that up to 115,000 vehicles use it per day, for an annual average of 34.7 million vehicles.

Maintenance

Over the last twenty years, major ongoing renovation programs have been completed, including painting and deck replacement to preserve the integrity of the structure and to ensure a safe passage for users. In 2016, a rebuilding cycle was completed for almost all pillars.

JCCBI, the structure's responsible manager, is carrying out a structural steel reinforcement program dating back to 1920, in order to extend the life span of the bridge. Specifically, some steel ribs and reinforcing plates have been replaced and reinforced.

Disruptions

This bridge has been shut down several times due to several protesters who have individually climbed on the superstructure of the bridge or on a sign in the Longueuil side of the bridge. Two of them were from the Fathers for Justice group, while a third claimed he was part of the group. Recently, a man wearing a Canadian flag climbed the structure of the bridge. Most of the protests led to massive traffic congestion during rush hour. Recently, the pedestrian paths were modified with the installation of round metal fences all around in both directions, to disallow climbing of the superstructure and discourage potential suicide jumpers, the two main problems associated with pedestrian traffic on the bridge.

"Living Connections", the lighting of the Jacques Cartier Bridge

To mark both the 150th anniversary of Canada and the 375th anniversary of Montreal, the bridge was refitted in 2017 with new decorative lights. The project, "Living Connections" was designed and installed over a period of 3 years by Montreal-based Moment Factory in collaboration with other local partners (Réalisations Inc. Montreal, Ambiances Design Productions, ATOMIC3, Éclairage Public/ Ombrages, Lucion Média and UDO Design). Project management was provided by JCCBI. The system, which allows for varying colors and animation, is scheduled to remain active until 2027. The interior lighting network changes with the passing of seasons, while the exterior lighting network uses big data, translated in real time to feed LED lighting networks on the outsides of the bridge superstructure, making the structure the first "connected" bridge in the world. Réalisations Inc. Montreal is responsible for the idea of using big data as a modulator of the bridge lighting program, as well as the design and production of the custom software and training of on-site operators to bring this concept to life.

Fifty-three types of data pertaining to Montreal, across eleven categories, are tracked to feed the bridge's lighting systems, included but not limited to; weather, traffic, noise and activity on social media. The bridge is then invaded by luminous movements in the colours of the most discussed topics of the day by the Montreal media: society (red), environment (green), technology (light blue), business (gray), sports (blue), institutions (pink), culture (purple). The systems track this data using physical capture systems such as sensors and cameras as well as through hashtags and keywords on online platforms. More information on how data is interpreted and expressed in light, and the systems used to do so, can be found on the Réalisations website.

The bridge is part of the cycle of the seasons thanks to a chromatic calendar of 365 colours. Day after day, it is transformed, progressively from the spring energizing green, to the radiant summer orange, to the voluptuous autumn red and the icy blue of winter. The bridge also gives the pulse of Montreal life in real time. The intensity, speed and density of light movements are fueled by the mention of Montreal on Twitter.

The first lighting up of the bridge occurred on May 17, 2017, the same day associated with the founding of Montreal in 1642 and officially kicking off the festivities for the 375th anniversary.

The illumination of the bridge in figures

  • 15,650 tonnes: weight of bridge superstructure
  • 10,000 fastening systems: to secure the luminaires on the steel supports fixed to the bridge
  • 10.4 km: cabling needed for bridge lighting for data transfer and power supply
  • 2,807 luminaires: thanks to a combination of projectors and strips, the steel superstructure lights up according to the effervescence of the metropolis.
  • More than 200 participants from all professional backgrounds contributed to the project (creative, engineers, designers, project managers, programmers, rope access technicians, electricians, steel erectors, traffic officers, etc.).

Text imported from Wikipedia article "Jacques Cartier Bridge" and modified on 12 May 2020 according to the CC-BY-SA 3.0 license.

Participants

Initial construction (1925-1930)
Design
Contractor
Rehabilitation (2001-2002)
Owner
Technical advisor to the owner
Structural engineering
Co-contractor
Prestressing

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20002534
  • Published on:
    16/12/2001
  • Last updated on:
    02/03/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine