|
 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0048925 |
| Created on: |
11/03/09 |
| Modified on: |
11/03/09 |
|
 |
 |
|
 |  |  |
|
|
|
| Click on the image to enlarge it. |
|
|
Structural Type:
|
|
|
Function / usage:
|
|
| Part of: |
A 73 Motorway (Germany)
|

| Legend: Phase of works |
| Role | Name | Part of structure |
| |
| Architect |
Axel Oestreich |
|
|

|
| Description | Value |
| |
Incremental launching
|
| deck |
prestressed concrete
|
| piers |
reinforced concrete
|
|
| |
total length |
218 m | | |
span lengths |
36.50 m - 45.00 m - 55.00 m - 45.00 m - 36.50 m | | |
height above valley floor or water |
ca. 35 m | | |
total width |
28.50 m |
|
|
 |