|
 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0038029 |
| Created on: |
07/12/08 |
| Modified on: |
11/04/09 |
|
 |
 |
|
 |  |  |
|
|
|
|
Function / usage:
|
|

| Legend: Phase of works |
| Role | Name | Part of structure |
| |
| Checking engineer |
H.-D. Köpper |
|
|

|
| Description | Value |
|
| |
length |
1 310 m |
|
| |
concrete volume |
68 500 m3 | | |
reinforcing steel |
6 950 t | | |
excavated material |
120 000 m3 | | |
shotcrete |
13 500 m2 |
|
| |
cost of construction |
€ 63 000 000 |
| tunnel |
cost of construction |
€ 48 000 000 |
|

|
|
 |