|
 |
 |
 |
| About this data sheet: |
| Structure-ID: |
s0023896 |
| Created on: |
10/19/06 |
| Modified on: |
11/04/09 |
|
 |
 |
|
 |  |  |
Bremen-Neustadt Footbridge |
 |
|
Built:
|
2005
- 2006
|
| Duration of works: |
16 months
|
| Status: |
in use
|
|
Location: |
Neustadt, Bremen, Bremen, Germany
|
|
Crosses: |
Autobahn A281
|
|
|
|
Structural Type:
|
|
|
Function / usage:
|
|
| Part of: |
A 281 Motorway (Germany)
|

| Legend: Phase of works |
| Role | Name | Part of structure |
| |
| Architect |
Ulf Sommer |
|
| Checking engineer |
U. Weyer |
|
|

|
| Description | Value |
| pylon |
steel
|
| deck |
steel
|
| stay cables |
steel wire
|
| railing |
wood
|
|
| |
total length |
105.38 m | | |
span lengths |
26.5 m - 29.118 m - 49.7 m |
| deck |
deck width |
3.74 m |
| pylon |
height |
30 m | | |
weight |
8 t |
|
| substructure |
concrete volume |
501 m3 | | |
reinforcing steel |
32 t |
| superstructure |
structural steel |
118 t |
|
| |
cost of construction |
€ 1 570 000 |
|

|
|
 |