 |  |  |
|
|
|
|
Structural Type:
|
|
|
Function / usage:
|
|
| Part of: |
A 38 Motorway (Germany)
|

|

|
| Description | Value |
| |
Balanced cantilever method
|
| deck |
prestressed concrete
|
| piers |
reinforced concrete
|
|
| |
length |
453 m | | |
span lengths |
40 m - 54 m - 82 m - 11 m - 158 m - 11 m - 97 m | | |
bridge surface |
13 363 m2 | | |
height above valley floor or water |
ca. 50 m |
| deck |
deck depth |
3.5 - 9.0 m | | |
deck width |
2 x 14.50 m |
|
| substructure |
concrete volume |
7 235 m3 | | |
reinforcing steel |
926 t |
| superstructure |
concrete volume |
13 600 m3 | | |
reinforcing steel |
2 040 t | | |
internal prestressing |
415 t | | |
external prestressing |
181 t |
|
| |
cost of construction |
€ 17 000 000 |
|

|

|